Contact
Aerial view of container terminals along a harbour channel

Projects

Every case study we publish follows the same engineering structure, from the original challenge to the decision it enabled.

How we document our work

  1. Challenge

    The engineering or operational problem, site conditions and constraints.

  2. Scope

    What was measured, inspected, designed or delivered.

  3. Approach

    Methods, technology and standards applied.

  4. Integration

    How capabilities combined to reduce cost, risk or programme.

  5. Outcome

    Decisions enabled, deliverables issued and value to the client.

Typical engagements

The examples below illustrate typical integrated scopes Marine Trex is structured to deliver. They are not references to completed projects. Published case studies will appear here with client approval.

Workboat passing a harbour breakwater

Ports & harbours

Port approach channel: depth assurance and marking

A port must confirm declared depths after maintenance dredging and re-mark a realigned approach channel.

  1. Pre-dredge MBES survey to IHO S-44 Special Order
  2. Independent quantity and progress verification
  3. Navigation risk review of the new alignment
  4. AtoN repositioning with AIS AtoN and as-installed certificates